Your critical path, calculated live, in the browser.
Transtra is for the professional planner who owns the schedule. Build the work breakdown, link the logic, and the dates, float and critical path are recalculated as you work. Nothing to install.
Coming soon
Registration opens when our terms are published.
01 of 03
Build the structure.
Lay out the work breakdown as a hierarchy of summaries, tasks and milestones. Durations, predecessors and lags go in the grid, the way a planner expects, and the outline renumbers as you move things.
- Finish-to-start, start-to-start and finish-to-finish links with lag
- Working calendars and resource assignments per task
- Column sets you can save and reuse across plans
| ID | Task name | Duration | Start | Finish | Predecessors |
|---|---|---|---|---|---|
| 1 | Surveys and enabling design | 25d | 6 Jul 26 | 7 Aug 26 | |
| 2 | North concourse | 22d | 6 Jul 26 | 4 Aug 26 | |
| 3 | Survey existing assets | 2d | 6 Jul 26 | 7 Jul 26 | |
| 4 | Coordinate concept design | 4d | 13 Jul 26 | 16 Jul 26 | 3FS |
| 5 | Develop access strategy | 8d | 20 Jul 26 | 29 Jul 26 | 4SS+2d |
| 6 | Review survey findings | 3d | 27 Jul 26 | 29 Jul 26 | 5FF+1d |
| 7 | Accept enabling package | 2d | 3 Aug 26 | 4 Aug 26 | 6FS |
| 8 | Baggage hall | 23d | 6 Jul 26 | 5 Aug 26 | |
| 9 | Survey existing assets | 3d | 6 Jul 26 | 8 Jul 26 | |
| 20 | Enabling design acceptance | 0d | 7 Aug 26 | 7 Aug 26 | 7FS, 13FS, 19FS |
02 of 03
Calculate the schedule.
Transtra runs the forward and backward pass every time the logic changes, so dates, total float and the critical path are always current. Findings point at the tasks where the model no longer holds.
- Critical path and total float on every task, by calendar
- Negative float, open ends and out-of-sequence progress raised as findings
- Analysis of every path, sorted by float
| Path | Finish | Total float |
|---|---|---|
| Surveys, detailed design, piling, deck, handover | 30 Jun 27 | 0d |
| Baggage hall fit-out and commissioning | 25 Jun 27 | 3d |
| Airside interfaces and acceptance | 22 Jun 27 | 6d |
03 of 03
Stay in control.
Set a status date, record progress, and compare the working plan with the version you published. Every change is explained against the baseline, so the conversation is about what moved and why.
- Status date with actual starts, finishes and percent complete
- Published versions and side-by-side comparison
- Print-ready views and PDF timeline exports
| Task | Published finish | Current finish | Change | Why |
|---|---|---|---|---|
| Stakeholder approvals | 3 Sep 26 | 9 Sep 26 | +6d | Actual start 4 days late |
| Issue for construction | 11 Sep 26 | 17 Sep 26 | +6d | Follows approvals |
| Piling, north concourse | 2 Nov 26 | 2 Nov 26 | 0d | Float absorbed |
| Handover | 30 Jun 27 | 6 Jul 27 | +6d | On the critical path |
Already have a plan in Microsoft Project?
Import the XML and keep the structure, logic, calendars and dates. Export it back the same way when the work needs to go somewhere else. Coverage follows the published field list.
Why it is called Transtra
Transtra is the Latin plural of transtrum, the crossbeams that held a rowing vessel together and gave each rower a seat to work from. One element was structural and human at once: part of the frame, and the place from which effort was applied.
A task in a plan is the same kind of thing: a span across time, held by the work around it, with someone in the seat. Dependencies connect those spans. Sequence lets separate contributions become one coordinated plan.
Seven days free, then £10 a month.
One plan for an individual professional planner, billed monthly. Registration opens when our terms are published.
Coming soon
Spans across time. Crew pulling together. A structure that holds.