Your critical path, calculated live, in the browser.

Transtra is for the professional planner who owns the schedule. Build the work breakdown, link the logic, and the dates, float and critical path are recalculated as you work. Nothing to install.

Coming soon

Registration opens when our terms are published.

01 of 03

Build the structure.

Lay out the work breakdown as a hierarchy of summaries, tasks and milestones. Durations, predecessors and lags go in the grid, the way a planner expects, and the outline renumbers as you move things.

  • Finish-to-start, start-to-start and finish-to-finish links with lag
  • Working calendars and resource assignments per task
  • Column sets you can save and reuse across plans
A work breakdown grid for the surveys and enabling design phase
IDTask nameDurationStartFinishPredecessors
1Surveys and enabling design25d6 Jul 267 Aug 26
2North concourse22d6 Jul 264 Aug 26
3Survey existing assets2d6 Jul 267 Jul 26
4Coordinate concept design4d13 Jul 2616 Jul 263FS
5Develop access strategy8d20 Jul 2629 Jul 264SS+2d
6Review survey findings3d27 Jul 2629 Jul 265FF+1d
7Accept enabling package2d3 Aug 264 Aug 266FS
8Baggage hall23d6 Jul 265 Aug 26
9Survey existing assets3d6 Jul 268 Jul 26
20Enabling design acceptance0d7 Aug 267 Aug 267FS, 13FS, 19FS

02 of 03

Calculate the schedule.

Transtra runs the forward and backward pass every time the logic changes, so dates, total float and the critical path are always current. Findings point at the tasks where the model no longer holds.

  • Critical path and total float on every task, by calendar
  • Negative float, open ends and out-of-sequence progress raised as findings
  • Analysis of every path, sorted by float
Analysis   15 paths listedSorted by total float
Schedule paths sorted by total float
PathFinishTotal float
Surveys, detailed design, piling, deck, handover30 Jun 270d
Baggage hall fit-out and commissioning25 Jun 273d
Airside interfaces and acceptance22 Jun 276d
Findings   12 on this plan
ERROR
Negative floatAgree test readiness, Airside interfaces, has 1 month of negative float.
Go to activity
WARNING
Out-of-sequence progressInstall baggage belts started before its predecessor finished.
Go to activity
RESOLVED
Missing successorIssue for construction now has a successor.

03 of 03

Stay in control.

Set a status date, record progress, and compare the working plan with the version you published. Every change is explained against the baseline, so the conversation is about what moved and why.

  • Status date with actual starts, finishes and percent complete
  • Published versions and side-by-side comparison
  • Print-ready views and PDF timeline exports
Compare   Working draft against Published v2Published 11 Sep 26
STATUS DATE26 Aug 26
PROJECT FINISH6 Jul 27 +6d
TASKS MOVED14 of 120
Tasks whose finish moved against the published version
TaskPublished finishCurrent finishChangeWhy
Stakeholder approvals3 Sep 269 Sep 26+6dActual start 4 days late
Issue for construction11 Sep 2617 Sep 26+6dFollows approvals
Piling, north concourse2 Nov 262 Nov 260dFloat absorbed
Handover30 Jun 276 Jul 27+6dOn the critical path

Already have a plan in Microsoft Project?

Import the XML and keep the structure, logic, calendars and dates. Export it back the same way when the work needs to go somewhere else. Coverage follows the published field list.

Why it is called Transtra

Transtra is the Latin plural of transtrum, the crossbeams that held a rowing vessel together and gave each rower a seat to work from. One element was structural and human at once: part of the frame, and the place from which effort was applied.

A task in a plan is the same kind of thing: a span across time, held by the work around it, with someone in the seat. Dependencies connect those spans. Sequence lets separate contributions become one coordinated plan.

A four-step technical diagram in which rowing thwarts become work spans, the spans become tasks across a timeline, and sequencing forms a critical path towards a milestone.

Seven days free, then £10 a month.

One plan for an individual professional planner, billed monthly. Registration opens when our terms are published.

Coming soon

Spans across time. Crew pulling together. A structure that holds.